Two GFS Bolted Tanks for Drinking Water Storage in Surabaya, Indonesia
Two GFS Bolted Tanks for Drinking Water Storage in Surabaya, Indonesia
A wastewater treatment plant in Surabaya, East Java, installed two glass-fused-to-steel bolted tanks to store drinking water on site. Panels shipped from China and were assembled by a local crew with Mondes supervision.
✓ Potable-water-safe coating · ✓ Bolted on-site assembly · ✓ Ø6.11 m and Ø6.88 m tanks
Project Snapshot
| Location | Surabaya, East Java, Indonesia |
| Facility | Wastewater treatment plant |
| Application | Drinking water storage |
| Tank type | Glass-Fused-to-Steel (GFS) bolted tank |
| Quantity | 2 sets |
| Tank A | Ø6.11 m × H4.8 m (nominal ~140 m³) |
| Tank B | Ø6.88 m × H4.8 m (nominal ~178 m³) |
| Accessories | caged ladder, maintenance platform, roof structure |
Nominal capacity is calculated from shell diameter and height and is given for reference only.
Background
The plant needed clean, reliable storage for drinking water used at the facility. Its options were limited: cast-in-place concrete tanks take months to build and are hard to extend, and welded steel tanks need heavy equipment on a site with tight access. The client wanted a tank that could be delivered quickly, assembled within the existing footprint, and keep the stored water safe to drink.

What We Supplied
Mondes supplied two glass-fused-to-steel bolted tanks together with their access and roof structures, delivered as flat-packed panels and assembled on site:
Key Features
On-Site Installation
The tanks were assembled in stages on the site:
- The concrete ring foundation was prepared and checked for level.
- Glass-fused-to-steel panels were positioned and bolted ring by ring, with joints sealed as work progressed.
- The roof structure and radial beams were installed on top of the shell.
- The platform and caged ladder were fitted for safe access.
- The local crew was briefed on assembly and the tanks were handed over for service.




Results
- Two GFS bolted tanks delivered and assembled on site
- Around 319 m³ of combined nominal drinking water storage
- Caged ladder and platform installed for safe access
- Local crew briefed on bolted assembly for future maintenance
Why the Client Chose Mondes
The client compared concrete, welded steel and bolted options. Mondes won on delivery time, site access and potable-water suitability. Our bolted tanks ship in standard containers, assemble without welding, and use a glass-fused coating designed for water contact. From quotation to handover the project ran through one supplier for tank, roof and access steelwork.
Frequently Asked Questions
A GFS (glass-fused-to-steel) bolted tank is built from steel panels coated with a glass enamel layer fired at high temperature. The panels bolt together on site, so the tank does not need welding.
Yes. The glass-fused coating resists corrosion and is designed for potable water storage. Certificates such as WRAS or NSF/ANSI 61 can be provided on request depending on the project.
A tank of this size is normally assembled in a few days to a couple of weeks depending on site conditions, crew size and foundation readiness.
Yes. Spiral staircases, caged ladders and maintenance platforms are supplied as part of the package, matched to the tank size and roof height.
Planning a water or wastewater storage project?
Send us your capacity, application and site photo. We will come back with a tank layout and quotation.
Email our teamΥπεύθυνος Επικοινωνίας: Mr. Richie
Τηλ.: +86 15902825209